Permit Information
Permit NumberBLD19-02988
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6132 E BARBER DR
Project NameLot 91 Block 1 Harris North
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - changing window at dining room, great room and master bed to sliding doors. Enlarging patio at back of house. JJN 12-19-19** **W.U.I. HILLSIDE ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3322 sq. ft., two story (first story 2374 sq. ft., second story 948 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 382 sq. ft. of covered patio/porch and a 1052 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED*** LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/7/20205/7/20205/7/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled5/7/20205/7/20205/7/2020PPASS
DetailsBrandon Shaw
BLD-Final5/4/20205/5/20205/5/2020ANR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance2/5/20202/6/20202/6/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in1/30/20201/31/20201/31/2020AFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick c/n posted//
BLD-Other1/30/20201/31/20201/31/2020APASS
DetailsJim Storey
Soffit inspection Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing11/18/201911/18/201911/18/2019PPASS
DetailsBrandon Shaw
OK to cover exterior...
BLD-Wall Bracing11/15/201911/15/201911/15/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kyle Seick. Several areas missing fasteners.
BLD-Foundation9/17/20199/17/20199/17/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing9/16/20199/16/20199/16/2019PPASS
DetailsBrandon Shaw
Work in progress...