BLD-Final | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Weltner
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided for associated trades on sign off card.
Ask for Jeff Roelke at the front door (he''ll have to let you in). Phone #: ###-#### Inspection requested via web by Todd Weltner
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Could not make it to this inspection due to work load and time constriants. Will need to be rescheduled. Ask for Jeff Roelke at the front door (he''ll have to let you in). Phone #: ###-#### Inspection requested via web by Todd Weltner
|
BLD-Final | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PEND |
Dave Hannah
|
|
|
Ask for Jeff Roelke at the front door (he''ll have to let you in). Phone #: ###-#### Inspection requested via web by Todd Weltner ok after fire oks
|
FIRE-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | FAIL |
Jim Page
|
|
|
FIR permit for fire alarm modifications needs to be completed before life fire safety inspection will be performed.
Ask for Jeff Roelke at the front door (he''ll have to let you in). Phone #: ###-#### Inspection requested via web by Todd Weltner
|
BLD-Framing/Rough-in | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Weltner
|