BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved.
|
BLD-Blower Door Test Results | 3/3/2020 | 3/3/2020 | 3/3/2020 | A | DONE |
Mike Jordan
|
|
|
6.5
|
BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | NR |
Tell Riley
|
|
|
Jeff Phone #: ###-####//need blower door test//ok otherwise//
|
BLD-Framing/Rough-in | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####//corrections made//framing and insulation ok//
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Tell Riley
|
|
|
jeff Phone #: ###-####//CN posted//add strap to inside of portal frame header per detail//add truss clips south side of garage//provide truss engineering//
|
BLD-Wall Bracing | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Dave Hannah
|
|
|
shear // Jeff Phone #: ###-####
|
BLD-Footing | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
James Phone #: ###-####//ok per plans//
|