Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD19-03251
StatusIssued
Name C & T CONSTRUCTION
Site Address 7791 W CRESTWOOD DR
Project Name7B
Customer NumberBLD19-03229, 03247 - 03257
ePlanReview 
Description
***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (12 PERMITS FILED WITH BLD19-03229) Permit for the construction of a new 1589 sq. ft., 3 story (first story 189 sq. ft., second story 750 sq. ft., third story 650 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 146 sq. ft. of covered patio/porch and a 450 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover4/16/20204/17/20204/17/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//Simpson shoe added for stud reinforcment on studs drilled for ele wire//ok when insulation is fixed//
BLD-Energy code compliance4/10/20204/10/20204/10/2020PPART
DetailsTell Riley
do not cover new electrical/// all other areas ok, corrections made, framing was walked through with engineer, contractor and I, corrections have been made//
BLD-Wall cover4/10/20204/10/20204/10/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funkcn issued to remove gyp to see framing corrections and insulation//
BLD-Energy code compliance4/1/20204/2/20204/2/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD-Framing/Rough-in3/29/20203/30/20203/30/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk////see corrections prior to any cover approval//need letter from engineer//ok to insulate//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
BLD-Framing/Rough-in3/25/20203/26/20203/26/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing3/11/20203/11/20203/11/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/nailing ok on firewall shear, per engineers email//
BLD-Wall Bracing3/6/20203/6/20203/6/2020PNR
DetailsTell Riley
carl - firewall nailing pattern Phone #: ###-####
BLD-Wall cover3/2/20203/3/20203/3/2020APASS
DetailsMike Jordan
Firewall insulation Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall cover2/23/20202/24/20202/24/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//rated separation walls only//blocking added at floor//insualtion needs to be R20 at exterior 2x8 rated walls//some insulation has fallen, would like to see as drywall is installed//
BLD-Wall cover2/20/20202/20/20202/20/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//still working on ELE// need to fix insulation//address fireblocking issue with Architect//remove siding in center unit to install 2 layers of 5/8 per detail//
BLD-Wall cover2/5/20202/5/20202/5/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//does not meet requirements for 2 hr assembly per plans//
BLD-Wall cover1/31/20202/3/20202/3/2020ACANC
DetailsTell Riley
Phone #: ###-#### firewall Inspection requested via web by Carl Funk
BLD-Wall cover1/30/20201/31/20201/31/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk/ needs plans
BLD-Wall Bracing1/30/20201/31/20201/31/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk,, exterior ok
BLD-Wall Bracing1/29/20201/29/20201/29/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//still need hold downs nailed correctly//
BLD-Wall Bracing1/7/20201/8/20201/8/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN issued//not quite ready//
BLD-Wall Bracing12/18/201912/19/201912/19/2019APART
DetailsTell Riley
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD-Wall Bracing12/18/201912/18/201912/18/2019PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing12/16/201912/16/201912/16/2019ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used inspection as conference//
BLD-Foundation10/17/201910/17/201910/17/2019PPART
DetailsTell Riley
wip
BLD-Footing10/15/201910/16/201910/16/2019APASS
DetailsTell Riley
SERGIO Phone #: ###-####//setbacks and rebar ok per plans//