Information based on query as of Monday, June 24, 2024.
Permit Information
Permit NumberBLD19-03253
StatusIssued
Name C & T CONSTRUCTION
Site Address 7817 W CRESTWOOD DR
Project Name2B
Customer NumberBLD19-03229, 03247 - 03257
ePlanReview 
Description
***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (12 PERMITS FILED BLD19-03229) Permit for the construction of a new 1589 sq. ft., 3 story (first story 189 sq. ft., second story 750 sq. ft., third story 650 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 146 sq. ft. of covered patio/porch and a 450 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover4/16/20204/17/20204/17/2020APASS
DetailsTell Riley
Brackets Phone #: ###-#### Inspection requested via web by Carl Funk/Simpson shoe added for stud reinforcment on studs drilled for ele wire//ok when insulation is fixed//
BLD-Energy code compliance4/1/20204/2/20204/2/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD-Framing/Rough-in3/29/20203/30/20203/30/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk////see corrections prior to any cover approval//need letter from engineer//ok to insulate//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
BLD-Framing/Rough-in3/26/20203/26/20203/26/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing3/13/20203/13/20203/13/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing3/11/20203/11/20203/11/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall cover2/23/20202/24/20202/24/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk rated separation walls only//blocking added at floor//insualtion needs to be R20 at exterior 2x8 rated walls//some insulation has fallen, would like to see as drywall is installed//
BLD-Wall cover2/20/20202/20/20202/20/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//still working on ELE// need to fix insulation//address fireblocking issue with Architect//remove siding in center unit to install 2 layers of 5/8 per detail//
BLD-Wall cover2/5/20202/5/20202/5/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//does not meet requirements for 2 hr assembly per plans//
BLD-Wall cover1/31/20202/3/20202/3/2020ACANC
DetailsTell Riley
Phone #: ###-#### firewall Inspection requested via web by Carl Funk
BLD-Wall cover1/30/20201/31/20201/31/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk/ needs plans
BLD-Wall Bracing1/30/20201/31/20201/31/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk,, exterior ok
BLD-Wall Bracing1/29/20201/29/20201/29/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/See red marks for corrections,straps, and nailing//
BLD-Wall Bracing1/7/20201/8/20201/8/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
BLD-Wall Bracing12/16/201912/16/201912/16/2019ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used inspection as conference//
BLD-Foundation10/14/201910/14/201910/14/2019PPART
DetailsTell Riley
Cergo Phone #: ###-####//WIP// need to install hold downs//
BLD-Footing10/10/201910/10/201910/10/2019PPART
DetailsTell Riley
Sergio Phone #: ###-####//rebar ok//maintain rear 15 ft setback when porch piers are setup--not yet set//