BLD-Final | 7/24/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/20/2020 | 7/24/2020 | 7/24/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.01
|
BLD-Final | 7/20/2020 | 7/24/2020 | 7/22/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 5/15/2020 | 5/19/2020 | 5/19/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/8/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Brandon Shaw
|
|
|
screened // jorge Phone #: ###-####
|
BLD-Foundation | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PART |
Tell Riley
|
|
|
wall // edgar Phone #: ###-####//need to pour frost wall at garage door opening per details on plans//WIP//
|
BLD-Footing | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Inspection at 11 am , concrete is schedule for 1 pm Phone #: ###-#### Inspection requested via web by Edgar Sanchez
|