BLD-Final | 1/27/2020 | 1/29/2020 | 1/31/2020 | P | PASS |
Brandon Shaw
|
|
|
See BLD19-04149 and ELE19-04007 for awning and sign installed by YESCO
|
DOC - Permit Finaled | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for scope of work complete, signature card not available at time of inspection.
Trent Phone #: ###-####
|
BLD-Final | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | NR |
Jim Storey
|
|
|
call with result -Trent Phone #: ###-#### ele and fire
|
BLD-Final | 12/6/2019 | 12/10/2019 | 12/10/2019 | A | FAIL |
Brandon Shaw
|
|
|
Prep work for awning is complete, awning to be installed at a later date...
|
BLD-Framing/Rough-in | 11/26/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Trent Phone #: ###-####
|
BLD-Framing/Rough-in | 11/22/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Trent Phone #: ###-####
|