BLD-Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Tell Riley
|
|
|
tim Phone #: ###-####//smoke detectors installed per code//final complete//
|
DOC - Permit Finaled | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | NR |
Tell Riley
|
|
|
call 30 mins to meet // Tim Phone #: ###-####//need to have interconnected smoke co alarms//discussed with owner and contractor//
|
BLD-Final | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PART |
Tell Riley
|
|
|
Tim Phone #: ###-####//addition complete per plans//will need access to mainhouse to verify smoke and smoke/CO detectors are in code required locations//
|
BLD-Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | FAIL |
Tell Riley
|
|
|
Austin Phone #: ###-####//CN posted//need to adjust grade for stoop in rear meets 7 3/4" max step//need approved plans//clean up debris//
|
BLD-Energy code compliance | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Tell Riley
|
|
|
TIM Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
Tim Phone #: ###-####//corrections made ok to insulate//
|
BLD-Framing/Rough-in | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | NR |
Tell Riley
|
|
|
Tim // please call 1 hr ahead of time Phone #: ###-####//add studs for support under beams at front entry in frame wall//complete air seal and fireblock at top bottom plates//
|
BLD-Other | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Tell Riley
|
|
|
Autin- sheer nail outside of house- pl;ease call prior if possible Phone #: ###-####
|
BLD-Foundation | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PART |
Tell Riley
|
|
|
STEAM WALL // Zack Phone #: ###-####//blankets onsite//will add for 2 layers//need to have STHD14s per plans//WIP//
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PART |
Tell Riley
|
|
|
Zack Phone #: ###-####//footing rebar ok// dimensions pulled from existing structure for setbacks--same as approved plans and within setback requirements//
|