BLD-Final | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Brandon Shaw
|
|
|
linda Phone #: ###-####
|
DOC - Permit Finaled | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.8
|
BLD-Final | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | NR |
Brandon Shaw
|
|
|
Post blower door test results... No other issues...
|
BLD-Energy code compliance | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Tell Riley
|
|
|
Rick Phone #: ###-####//corrections made//
|
BLD-Energy code compliance | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | NR |
Dave Hannah
|
|
|
Rick Phone #: ###-#### still working on c/n items
|
BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PART |
Tell Riley
|
|
|
Rick Phone #: ###-####//CN posted for corections//ok to insulate//
|
BLD-Wall Bracing | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Tell Riley
|
|
|
Rick Phone #: ###-####//need to add hot dip nails to PT//add hardware for portal frames on inside//ok to wrap//chack at interior shear inspection//
|
BLD-Foundation | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PART |
Tony Young
|
|
|
Wall // Ryan Phone #: ###-####
|
BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####.. wip
|
BLD-Footing | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####.. work in progress
|