BLD-Concrete | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PART |
Tony Young
|
|
|
screened // Austin Phone #: ###-####// upper foundation wall
|
BLD-Conference | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Tony Young
|
|
|
want to discuss entry stairs and confirm framer fixes are acceptable Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Concrete | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Tony Young
|
|
|
screened - rebar // Austin Phone #: ###-#### upper footings ok,, soils ok via e-mail
|
BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Tony Young
|
|
|
wall insulation in, would like to sheetrock Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Wall cover | 4/19/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Tony Young
|
|
|
Townhome has been airsealed, would like to install wall insulation and sheetrock Phone #: ###-#### Inspection requested via web by ron beckman// frame ok,, ok to insulate
|
BLD-Energy code compliance | 4/19/2020 | 4/20/2020 | 4/19/2020 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by ron beckman Inspection cancelled from web by: ron beckman
|
BLD-Conference | 4/16/2020 | 4/16/2020 | 4/17/2020 | P | PART |
Tony Young
|
|
|
Would like fire wall framer fixes inspected and would like to insulate part of garage ceiling so garage doors can be installed to secure building Phone #: ###-#### Inspection requested via web by ron beckman,, seperation fire wall fixes ok,, work in progress
|
BLD-Wall Bracing | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Dave Hannah
|
|
|
additional hold downs were installed 4/2/2020. Would like to cover exterior walls for stucco prep Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Wall Bracing | 3/26/2020 | 3/27/2020 | 3/30/2020 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by ron beckman nailing of pannals ok but hold dows/bolting of portel frame panals not done
|
BLD-Foundation | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Dave Hannah
|
|
|
rebar // Austin Phone #: ###-####
|
BLD-Footing | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | CANC |
Tony Young
|
|
|
austin Phone #: ###-####// wrong permit called in
|
BLD-Wall Bracing | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, upper firewalls ok
|
BLD-Framing/Rough-in | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, pony wall ok to cover
|
BLD-Wall Bracing | 2/18/2020 | 2/18/2020 | 2/19/2020 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####// lower garage firewall ok
|
BLD-Foundation | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, work in progress on upper foundation walls
|
BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####// upper level of home footings
|
BLD-Foundation | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tony Young
|
|
|
Austin Phone #: ###-####
|
BLD-Foundation | 12/4/2019 | 12/5/2019 | 12/6/2019 | P | PART |
Tony Young
|
|
|
Austin Phone #: ###-####
|
BLD-Foundation | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PART |
Tell Riley
|
|
|
Austin Phone #: ###-####//garage portion only//ok per plans//discussed cold weather requirements--will get blankets onsite// WIP//footings only//
|