Permit Number | BLD19-03515 |
Status | Finaled |
Name |
GASPAR MOLINA RODRIGUEZ
|
Site Address |
3599 S FEDERAL WAY
|
Project Name | IHOP BURN REPAIR PERMIT |
Customer Number | |
ePlanReview | Yes |
Description |
(IHOP FEDERAL WAY – FIRE DAMAGE REPAIR PERMIT) ""PREINSPECTION IS REQUIRED PRIOR TO THE START OF ANY WORK" SECOND STRUCTURAL ENGINEER INSPECTION REQUIRED AFTER PILASTER REMOVED*** Permit for repairs to a restaurant building resulting from fire/water damage. Note: This building was constructed in 2008 using the 2006 IBC under BLD08-00595. This is a scope of work permit only; A Letter of Completion is to be issued when done. Approval is contingent upon adhering to the approved plans and engineering on file. Work to include: removal of existing pilaster at which time an additional structural inspection must be completed to verify extent of damage to the building. This permit is not to be finalled until building department receives and approves of repairs after the second structural inspection. MDH
|