BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PART |
Tell Riley
|
|
|
Homeowner will be available to do the final walk around Phone #: ###-#### Inspection requested via web by Christian Mikesell//addition ok per plans//smoke CO detectors added to house//only need hard surface at entry to final//
|
BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell
|
BLD-Energy code compliance | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//checked interior shear as well--ok per engineering//R21 wall insulation--R30 attic insulation//
|
BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//ok to insulate//will need to check shear on inside//
|
BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | CANC |
Tell Riley
|
|
|
Not sure if this is ''Shear Inspection'' Phone #: ###-#### Inspection requested via web by Christian Mikesell//needs shear//
|
BLD-Framing/Rough-in | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//not ready for framing//
|
BLD-Foundation | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PART |
Tell Riley
|
|
|
Stemwall is formed and ready for inspection. Concrete blankets draped over forms Phone #: ###-#### Inspection requested via web by Christian Mikesell//ok when rebar clearances fixed//discussed anchor bolts for hold downs per engineering//
|
BLD-Footing | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PART |
Tell Riley
|
|
|
Concrete blankets on forms currently Phone #: ###-#### Inspection requested via web by Christian Mikesell//blankets onsite covering formwork//pour today//add rebat verts across garage doorway//
|
BLD-Footing | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//discussed cold weather concrete practices and inspection prcedures//
|