BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Storey
|
|
|
call ahead for access // Allison Phone #: ###-####
|
BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 | P | NR |
Mike Jordan
|
|
|
Allison Phone #: ###-####. No access. doors locked.
|
FIRE-Final Inspection | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher will be mounted in discuused location and has a current inspection tag. Signage to be placed on main door ready "Door to remain unlocked while space is occupied" before final BLD inspection, final life fire safety inspection for area of work complete.
Allison Phone #: ###-####
|