Information based on query as of Saturday, July 13, 2024.
Permit Information
Permit NumberBLD19-04134
StatusFinaled
Name MUSSELL CONSTRUCTION
Site Address 6981 W OVERLAND RD
Project NameBank of Idaho
Customer Number 
ePlanReviewYes
Description
(BANK OF IDAHO) Permit is to remodel an existing 2,444 sq. ft. bank business. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select nonbearing walls, removal of select door/door frames, removal of select millwork, removal of plumbing fixtures and accessories, construction of select new interior non-bearing walls, select door/door frames, millwork, new accessible restroom, select new suspended acoustic and gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/23/20207/23/20207/23/2020PPASS
DetailsBrandon Shaw
The bank lobby is closed. You will need to tap on the door to get their attention to get in. Please call Mark Fledderjohann 208 284 3268 if you have any questions. Phone #: ###-#### Inspection requested via web by Mark Fledderjohann
DOC - Permit Finaled7/23/20207/23/20207/23/2020PPASS
DetailsBrandon Shaw
FIRE-Final Inspection7/21/20207/22/20207/22/2020APASS
DetailsTroy Cobbley
life safety passed

The bank lobby is closed. You will need to bang on the door to get them to let you in. They are usually there by 8 am and close at 5 pm. Please call me if you have any questions. Phone #: ###-#### Inspection requested via web by Mark Fledderjohann
BLD-Final7/20/20207/21/20207/21/2020PNR
DetailsMike Jordan
The bank''s lobby is closed, you will need to knock on the door to get the occupants to let you in. Phone #: ###-#### Inspection requested via web by Mark Fledderjohann. Needs fire final first.
BLD-Framing/Rough-in1/22/20201/22/20201/22/2020PPART
DetailsJim Storey
The bank is open from 9:30 until 5:00 pm. This is a partial inspection as the bank needs to keep one restroom and the storage area untouched while we finish the other areas so they can continue to operate. The bank is operational while the work is going on. Phone #: ###-#### Inspection requested via web by Mark Fledderjohann// c/n facing on insulation above ceilling must be covered to meet listing/ bracing of top of walls requried/ needmech permit// ok to cover walls.