Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04185
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF BOISE
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly Dugouts & Backsto
Customer Number 
ePlanReviewYes
Description
(BISHOP KELLY DUGOUTS & BACKSTOP) Permit to replace backstop and (2) existing softball dugouts. Work to include: demo of existing softball dugout; construction of new 735 sq ft home dugout with locker room and storage room and new 350 sq ft guest dugout with storage room; replacing existing backstop with new backstop; new accessible concrete path to dugouts and field. Special inspection required for masonry construction per the engineer. All work per approved plans and Engineering. This building is not fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20203/18/20203/18/2020PPASS
DetailsMike Jordan
Chad Phone #: ###-####
DOC - Permit Finaled3/18/20203/18/20203/18/2020PPASS
DetailsMike Jordan
FIRE-Final Inspection3/18/20203/18/20203/18/2020PPASS
DetailsMike Jordan
Chad Phone #: ###-####
BLD-Final3/16/20203/17/20203/17/2020AFAIL
DetailsMike Jordan
Chad Phone #: ###-####. Needs to provide final letter from special inspection agency and provide fire extinguisher in both storage rooms.
BLD-Framing/Rough-in3/3/20203/3/20203/3/2020PPASS
DetailsMike Jordan
Chad- plan mod has nothing to do with what is being inspected Phone #: ###-####. roof framing for dug outs.
BLD-Framing/Rough-in2/24/20202/25/20202/25/2020APASS
DetailsMike Jordan
chad Phone #: ###-####. Top of footing to 18 inches above grade (top of wall) perimeter around back stop.
BLD-Foundation2/12/20202/13/20202/13/2020APASS
DetailsDave Hannah
rebar // Chad Phone #: ###-#### top lift cmu ok to grout
BLD-Concrete1/29/20201/30/20201/30/2020PPASS
DetailsBrandon Shaw
chad Phone #: ###-####
BLD-Footing1/14/20201/16/20201/16/2020PPASS
DetailsTell Riley
Chad- rebar inspection Phone #: ###-####//rebar ok per plans//ok to pour-blankets onsite//pending any required specials//
BLD-Foundation1/13/20201/14/20201/14/2020PCANC
DetailsDave Hannah
Chad - rebar Phone #: ###-####
BLD-Footing1/14/20201/14/20201/14/2020PCANC
DetailsDave Hannah
BLD-Footing12/31/20191/3/20201/3/2020APASS
DetailsMike Jordan
josh Phone #: ###-####. Remaining footings for 3 back stop poles, north side.
BLD-Footing1/2/20201/2/20201/2/2020PPASS
DetailsMike Jordan
Footing for back stop poles, 3 on south side.
BLD-Footing12/31/20191/2/20201/2/2020APASS
DetailsMike Jordan
josh Phone #: ###-####. Rebar cages ok.
BLD-Concrete2/21/20202/21/2020 P 
DetailsMike Jordan
CMU wall - pouring at 2pm // Chad Phone #: ###-####