BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Tell Riley
|
|
|
Dean- call 30 min prior if possible Phone #: ###-####//R-13 added to fill cavity and suported by twine below the r- 19 that was stapled to sub floor//final is complete//
|
DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | NR |
Tell Riley
|
|
|
Dean Phone #: ###-####
|
BLD-Final | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | NH |
Tell Riley
|
|
|
Dean- call for access Phone #: ###-####//no access dogs in house let GC know//
|
BLD-Final | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | NR |
Tell Riley
|
|
|
Dean- call for access Phone #: ###-####//no plumbing needed per Matt based on phone call//need to fix insulation in crawlspace--stapled to underfloor and compressed--some areas have gaps between the batts//
|
BLD-Energy code compliance | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tell Riley
|
|
|
call for access- Dean Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tell Riley
|
|
|
call for access- Dean Phone #: ###-####//no plumbing changes--drain was inspected in mech permit//trades rough ok//framing ok per plans//
|
BLD-Framing/Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PART |
Tell Riley
|
|
|
call for lock box info // Dean Phone #: ###-####//under floor beam fix for damage//beam fix ok per engineering and working on wall stud fixes//under floor ok//need mechanical and plumbing and electrical rough ins completed prior to complete framing//
|