BLD-Final | 6/24/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Tony Young
|
|
|
screened // Melvin Phone #: ###-####
|
BLD-Final | 6/9/2020 | 6/11/2020 | 6/11/2020 | P | PART |
Tell Riley
|
|
|
screened // Melvin Phone #: ###-####//need verification of ACHD sign off//need special inspection reports//provide RFI structural details for opening steel framing that does not reflect design on plans, bolting, member size, etc//ok to use vault as fire life safety has passed//
|
FIRE-Final Inspection | 6/9/2020 | 6/11/2020 | 6/11/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. screened // Melvin Phone #: ###-####
|
BLD-Final | 6/9/2020 | 6/9/2020 | 6/10/2020 | P | NR |
Tell Riley
|
|
|
Melvin Phone #: ###-####//this inspection was used as phone conference throughout the day to discuss required signatures and finals for Thursdays final inspection//
|
BLD-Framing/Rough-in | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Tell Riley
|
|
|
Malivin *screened* Phone #: ###-####//pictures sent of hangers nailed on trusses//mechanical in this area ok to cover per mechanical inspector conversation//
|
BLD-Framing/Rough-in | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | NR |
Tell Riley
|
|
|
Melvin Phone #: ###-####220//need to add nails to hangers, other framing ok per plans//need mechanical rough for this side, electrical as well//
|
BLD-Framing/Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Mike Jordan
|
|
|
Melvin *screened* Phone #: ###-####. All preivous issues have been resolved. Ok to isulate and or rock area east of vault. Will inspect remainder of roof north of vault when there is accesss.
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | NR |
Tell Riley
|
|
|
call to meet / Melvin Phone #: ###-####//need to add blocking and nail sheathing where roof meets exisitng//add strap per detail//check trusses on next inspection//
|
BLD-Other | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | PART |
Tell Riley
|
|
|
roof nailing // melvan Phone #: ###-####//ok when nails added in the field at 6" oc per plans//
|
BLD-Foundation | 3/11/2020 | 3/12/2020 | 3/12/2020 | P | PART |
Tell Riley
|
|
|
bruce Phone #: ###-####//WIP//ok pending specials///slab for addition//
|
BLD-Energy code compliance | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Tell Riley
|
|
|
Bruce Phone #: ###-####//foundation wall insulation per plans//
|
BLD-Foundation | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Tell Riley
|
|
|
Bruce-stem wall foundation Phone #: ###-####//pending specials//
|
BLD-Footing | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Tell Riley
|
|
|
BRUCE Phone #: ###-####//ok pending specials for concrete rebar and epoxy//
|