Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04398
StatusIssued
Name TAYLOR SHELLIE
Site Address 614 S EAGLESON RD
Project NameTaylor Remodel
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION - Changes to footings used for bearing points, redesigned hallway floor plan, putting a mechanical platform in the attic. JJN 03/25/20** Permit for an interior remodel, to include: Changing existing bedroom into master bathroom, reconfiguring master bedroom, removing one bearing wall in living room area and adding in new footings and posts and vaulting ceiling in living room and kitchen. - All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/25/20206/26/20206/26/2020APASS
DetailsTell Riley
Please call before coming to make sure someone is home and give plenty of time to get home.
Thanks Phone #: ###-#### Inspection requested via web by Shane Taylor//framing corrections made//energy ok//
BLD-Framing/Rough-in5/14/20205/18/20205/18/2020APART
DetailsTell Riley
call for access- Shellie *screened* Phone #: ###-####//see correction notice//add 2x6 at 8"oc across entire furnace platform//remove area of platform over closet bathroom area//add supports to rafters to beam over vault area and take photos for verification//ok to insulate and complete air seal//
BLD-Framing/Rough-in3/17/20203/17/20203/17/2020PNR
DetailsTell Riley
please come to the back yard through the sliding glass door. Please call before coming. Thanks Shane Phone #: ###-#### Inspection requested via web by Shane Taylor//still need plan modification approved by plan review//
BLD-Conference12/9/201912/10/201912/10/2019ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Taylor//need to submit plan modification for footing changes for bearing points, added mechanical platform in ceiling rafters, hallway width changes///will need mechanical, plumbing and electrical roughs passed prior to framing inspection//