BLD-Final | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Tell Riley
|
|
|
call for access Terry Phone #: ###-####//building complete//helical anchors installed in locations noted on plans//
|
DOC - Permit Finaled | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Footing | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PART |
Tell Riley
|
|
|
already discussed the setbacks//want to see them drill in the rock anchors///set backs ok//pin in back of lot, inside fence, bumped building forward to meet plans//still may be issues with the rock anchors being installed//
|
BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 | P | CANC |
Tell Riley
|
|
|
Jerry Phone #: ###-####//not ready//discussed finding property pins for 3 foot setback//will need to visually see pins to verify setbacks//also discussed rock anchors///
|