BLD-Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Call Dan for access if needed Phone #: ###-#### Inspection requested via web by Daniel Appel
|
DOC - Permit Finaled | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/13/2020 | 5/13/2020 | 5/13/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.3
|
BLD-Energy code compliance | 3/16/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Framing/Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Other | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Inspect rated soffit at sides of dwelling Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Brandon Shaw
|
|
|
Garage shear Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Brandon Shaw
|
|
|
2nd floor shear. Stairs are in Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PART |
Brandon Shaw
|
|
|
First fl only... Eaves to be reduced to 6", as per plans...
|
BLD-Foundation | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Brandon Shaw
|
|
|
WALL // Chris Phone #: ###-####
|
BLD-Footing | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|