Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-04625
StatusFinaled
Name HC COMPANY INC
Site Address 5777 N MEEKER AVE
Project NameWaFd Bank Boise Basement TI
Customer Number 
ePlanReviewYes
Description
(BODYBUILDING.COM) The project consists of a 7,634 s.f TI within the NW corner of the existing basement. Work includes construction of men's and women's locker rooms, a gym/training/skills space for Bodybuilding.com and modifications to the existing MEP and fire protection systems to support the new area. The Contractor shall phase construction and coordinate with the Building Inspector to obtain temporary occupancy of the gym space while the locker rooms are being completed. An accessible shower room is being provided that includes an accessible locker, shower, and bench. Finishes include replacing flooring, cabinets, counters, and interior finishes shall be in compliance with Ch. 8 of the current IBC. All separation walls / shafts / penetrations / exit enclosures within this space must be maintained. Any new wall framing must be of non-combustible building materials. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20206/11/20206/11/2020PPASS
DetailsTell Riley
screened // john Phone #: ###-####//final occupancy ok as fire life safety has been completed//signed card//
FIRE-Final Inspection6/10/20206/10/20206/10/2020PPASS
DetailsTroy Cobbley
Life safety passed.

Miles *screened* Phone #: ###-####
FIRE-Conference6/10/20206/10/20206/10/2020PPASS
DetailsTroy Cobbley
Door mags function tested and passed on both doors.
BLD-Final3/20/20203/20/20203/20/2020PPART
DetailsTell Riley
Please call for building access. Ready anytime today Phone #: ###-#### Inspection requested via web by Jonathan Craft//fire life safety temp ok per Troy, temp ok for locker rooms//
BLD-Final3/2/20203/2/20203/2/2020PPART
DetailsMike Jordan
John Phone #: ###-####. Ok to occupy gym only. Transitions in flooring installed.
BLD-Final2/20/20202/21/20202/21/2020PNR
DetailsTell Riley
john ###-####//walk through for temp occupancy//would like to see flooring installed for transitions noted on plans//
FIRE-Final Inspection2/20/20202/21/20202/21/2020APART
DetailsTroy Cobbley
The life safety in the Gym area is complete. Fire alarm and fire sprinkler as well.

John Phone #: ###-####
FIRE-Conference2/18/20202/18/20202/18/2020PDONE
DetailsTroy Cobbley
John and I went over requirements to allow certain areas to be occupied.

John Kraft Phone #: ###-####
BLD-Framing/Rough-in1/31/20202/3/20202/3/2020APASS
DetailsTell Riley
John Phone #: ###-####//need to add backing for grab bars--wood will need to be fire treated//will take photos as installed//all other framing ok per plans//
BLD-Framing/Rough-in1/7/20201/8/20201/8/2020PPART
DetailsTell Riley
John Phone #: ###-####//Soth wall demising ok to cover// ele approved//see plans for signature of approved area//