Permit Information
Permit NumberBLD19-04871
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5875 E FOXGROVE DR
Project NameLOT 21 BLOCK 2 HARRS NORTH 3
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 3027 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 561 sq. ft. of covered patio/porch and a 925 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***Sprinklers are not required***LGM**D_S A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/16/20206/17/20206/17/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled6/17/20206/17/20206/17/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results6/17/20206/17/20206/17/2020PDONE
DetailsBrandon Shaw
ACH50-3.81
BLD-Wall Bracing3/18/20203/19/20203/19/2020PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance3/17/20203/18/20203/18/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in3/13/20203/13/20203/13/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other3/12/20203/13/20203/13/2020APASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing2/24/20202/24/20202/24/2020PPART
DetailsBrandon Shaw
Hold downs to be as per plans, see plans for locations of missing hardware...
BLD-Foundation1/30/20201/30/20201/30/2020PFAIL
DetailsBrandon Shaw
Footing and foundation poured without inspection, proceed at own risk...