BLD-Final | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-#### framing ok// paln reviewer no engery code required on plan.
|
BLD-Energy code compliance | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-#### foundation insulation ok to cover
|
BLD-Conference | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | DONE |
Jim Storey
|
|
|
david Phone #: ###-####
|
BLD-Conference | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | DONE |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Jim Storey
|
|
|
Check on work. Possible plumbing going in. Plumbing permit is not required. no plm
|
DOC - Permit Finaled | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Dave Hannah
|
|
|
plans on east side of shed // David Phone #: ###-#### shear ok framing ok no elc,plb,mec being installed
|
BLD-Framing/Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | FAIL |
Bob Archibald
|
|
|
David Phone #: ###-#### - Plans are hanging on the east wall of the shed in the back, green folder. Shear nailing required to be 6&12". Shell reported to be unfinished no trade roughins Shell framing OK.
|
BLD-Framing/Rough-in | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | FAIL |
Brandon Shaw
|
|
|
No city approved plans found on site...
|
BLD-Footing | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|