BLD-Final | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Tell Riley
|
|
|
SCREENED // Eric Phone #: ###-####//R38 in attic, ok as window U values are .29 and lower for all glass//R21 in walls//final complete//
|
DOC - Permit Finaled | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | DONE |
Tell Riley
|
|
|
5.9 ACH 50
|
BLD-Final | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PART |
Tell Riley
|
|
|
Jake - */Screened*/ Phone #: 2###-####//ok for temp//need blower door and insulation tag posted//smoke/CO combo in bedroom and hall//
|
BLD-Final | 7/10/2020 | 7/10/2020 | 7/10/2020 | P | NR |
Tell Riley
|
|
|
screened // Eric Phone #: ###-####//let contact know that zoning final is needed prior to building final, once zoning has made entry in activity log, building final can be completed//left voice message//
|
BLD-Framing/Rough-in | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Brandon Shaw
|
|
|
Framing corrections SAT... Insulation,ok... OK to cover...
|
BLD-Framing/Rough-in | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PART |
Tell Riley
|
|
|
screened // Jake Phone #: ###-####//correction notice posted for truss framing corrections//ok to insulate only//
|
BLD-Wall Bracing | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PART |
Tell Riley
|
|
|
Jake Phone #: ###-####//Add blocking to all panel joints per plans//framers were adding hot dip galvanized nails at PT as well//
|
BLD-Footing | 4/23/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Jim Storey
|
|
|
screened- no need for inspector to enter home, access through gate- rebar inspection -Erik Phone #: ###-#### ft and wall ok
|