BLD-Blower Door Test Results | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | DONE |
Tell Riley
|
|
|
4.0 ACH 50
|
BLD-Final | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Tell Riley
|
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//plan mod for R38 in attic//final complete//
|
DOC - Permit Finaled | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//mechanical passed//framing corrections made//
|
BLD-Framing/Rough-in | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need mechanical//still need to fix trusses//
|
BLD-Energy code compliance | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need mechanical//
|
BLD-Framing/Rough-in | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//See correction notice posted//ok to insulate only//
|
BLD-Other | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Tell Riley
|
|
|
Sheetrock soffit Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Wall Bracing | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Wall Bracing | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need to add hot dipped galvanized nails at pt//see plans for red marks where block need added//
|
BLD-Foundation | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PART |
Tell Riley
|
|
|
pouring at 12:45 pm- Mark Phone #: ###-####//WIP//
|
BLD-Footing | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//WIP//setbacks ok on west side front//check E side at wall//clean mud out of footings//
|