Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-00098
StatusFinaled
Name ARMADA HOMES
Site Address 9710 W MACAW ST
Project NameEronel 5-3
Customer Number 
ePlanReviewYes
Description
***07/16/20 PLAN MODIFICATION TO REMOVE REBAR IN FOUNDATION NOTES AND CHANGE GLAZING TO U31 FOR R-38 IN ATTIC*** Permit for the construction of a new 1964 sq. ft., two story (first story 1305 sq. ft., second story 659 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 79 sq. ft. of covered patio/porch and a 491 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results7/17/20207/17/20207/17/2020ADONE
DetailsMike Jordan
4.4
BLD-Final7/16/20207/17/20207/17/2020APASS
DetailsMike Jordan
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover
DOC - Permit Finaled7/17/20207/17/20207/17/2020PPASS
DetailsMike Jordan
BLD-Framing/Rough-in3/20/20203/23/20203/23/2020APASS
DetailsTell Riley
corrections made//need to add sds screws to 2x4 bottom chord on girder truss//insulation ok as well//
BLD-Framing/Rough-in3/20/20203/20/20203/20/2020PNR
DetailsTell Riley
Joist in garage Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Framing/Rough-in3/16/20203/17/20203/17/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover//need Mechanical and stove inspections//correction notice posted for various framing issues//
BLD-Other3/11/20203/12/20203/12/2020APASS
DetailsTell Riley
Soffit sheetrock Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Wall Bracing2/24/20202/24/20202/24/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover//nailing ok// still need to add blocks//were working on them when i left//
BLD-Wall Bracing2/20/20202/20/20202/20/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover//need to add hot dipped galvanized nails, and blocking see red marks on plans//
BLD-Foundation1/21/20201/22/20201/22/2020APART
DetailsTell Riley
Mark- Pour time 11am STEM WALL Phone #: ###-####//WIP//discussed with contractor about cold weather protection//cold weather protection will need to be provided//
BLD-Footing1/21/20201/21/20201/21/2020PPART
DetailsTell Riley
Pour at 1:30 // Mark Phone #: ###-####//setbacks ok per plans//WIP//