BLD-Energy code compliance | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Dave Hannah
|
|
|
Please call 30 minutes prior, for entry with lockbox code. Thank you! Phone #: ###-#### Inspection requested via web by Cara Heisey
|
BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | NR |
Dave Hannah
|
|
|
Home is unoccupied. Please call Cara @ ###-####, for lockbox code. Thank you! Phone #: ###-#### Inspection requested via web by Cara Heisey
|
BLD-Framing/Rough-in | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | NR |
Tony Young
|
|
|
Home is unoccupied. Please call Cara @ ###-####, for lockbox code. Thank you! Phone #: ###-#### Inspection requested via web by Cara Heisey// walk through,, NEEDS MECH PASS ,, ok to insulate after mech pass
|