Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD20-00344
StatusIssued
Name HC COMPANY INC
Site Address 5777 N MEEKER AVE
Project NameWashington Federal Bank Buildi
Customer Number 
ePlanReviewYes
Description
(WASHINGTON FEDERAL BANK BOISE CAMPUS - 1ST FLOOR T.I.) Certificate of completion to be issued upon final inspection approval. This building is fire sprinkled for area increase. Phasing of work is permitted, inspector to be informed at beginning of project and all required means of egress are to be operational during all phases of work. Permit to remodel approximately 40,800 sqft. on the first floor of a 2 story building with basement. Work to include: Demo of non-structural interior partition walls, suspended acoustical ceilings. gypsum board soffits, mechanical ductwork, millwork, finishes, plumbing fixtures, lighting and electrical. New work to include: construction of non-structural partition walls to create private offices, open office space, conference rooms and a break room, modifications to the existing mechanical, plumbing, electrical and fire protection system to support the new area. Approval is contingent on adhering to the approved plans. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Ceiling Grid Inspection8/6/20208/7/20208/7/2020APASS
DetailsTell Riley
Miles *screened* Phone #: ###-####//mechanical passed//ok to fill grid in phase 2//
BLD-Ceiling Grid Inspection8/4/20208/5/20208/5/2020PPART
DetailsTell Riley
Miles- */Screened*/ Phone #: ###-####//grids phase 2 ok pending mechanical rough in//do not cover until mechanical has passed//
BLD-Ceiling Grid Inspection7/22/20207/23/20207/23/2020APART
DetailsTell Riley
Request to lay ceiling tiles in areas with passed overhead inspections Phone #: ###-#### Inspection requested via web by Miles Gastil//ok to cover grid in phase one//
BLD-Ceiling Grid Inspection7/15/20207/15/20207/15/2020PPART
DetailsTell Riley
screened // Miles Phone #: ###-####//phase one grid areas//mech passed//Fire sprinkler passed//ok to flood grid in areas of phase one that electrical has passed//other areas are pending eletrical approval//
BLD-Framing/Rough-in6/25/20206/26/20206/26/2020APART
DetailsTell Riley
screened // John Phone #: ###-####//areas marked on plans ok per plans and engineering clarification//some areas are pending ELE rough and were marked accordingly//
BLD-Framing/Rough-in4/29/20204/30/20204/30/2020APART
DetailsTell Riley
Confirmation to sheetrock inspected soffits throughout
Phone #: ###-#### Inspection requested via web by Miles Gastil//ok to cover soffits, 2-where mechanical is present, and fire spinklers signed off, also areas where no mechanical, but electrical and fire sprinklers are approved//framing was looked at previously, ok now that rough ins have been approved//
BLD-Framing/Rough-in4/24/20204/24/20204/24/2020APEND
DetailsTell Riley
Soffit inspection Phone #: ###-#### Inspection requested via web by Miles Gastil//walk through on soffits, framing appears to be ok, need fire sprinkler approval, and mechanical pass//
BLD-Framing/Rough-in4/7/20204/7/20204/7/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Miles Gastil//marked on electrical plan areas marked in green ok//
BLD-Framing/Rough-in3/30/20203/31/20203/31/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Miles Gastil//areas marked in pink on electrical page and approved for cover by electrical ok for wall cover only//