BLD-Energy code compliance | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
Tell Riley
|
|
|
Randy - */Screened*/ Phone #: ###-####//contractor will make sure insulation shield is installed around hot water heater vent above garage prior to cover//
|
BLD-Energy code compliance | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PART |
Tell Riley
|
|
|
screened // Randy Phone #: ###-####//unit 7790 only ok for cover when truss brace is installed//other side needs mechanical rough in inspection//
|
BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Tell Riley
|
|
|
Randy *screened* Phone #: ###-####//ok to insulate//add truss bracing// add for three ply headers in back//move water box out of rated wall in 7790//
|
BLD-Wall Bracing | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PART |
Tell Riley
|
|
|
Randy Phone #: ###-####//ok when nails added per discussion//
|
BLD-Other | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Tell Riley
|
|
|
separation wall between units ok per plans//previously inspected prior to wall being stood in place//
|
BLD-Foundation | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PART |
Tell Riley
|
|
|
Randy Phone #: ###-####//WIP//
|
BLD-Footing | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PART |
Tell Riley
|
|
|
Randy Phone #: ###-####//ground temps ok now//rebar ok, setbacks appear to meet minimums//
|
BLD-Footing | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | FAIL |
Tell Riley
|
|
|
Randy Phone #: ###-####//frozen ground//
|