Permit Information
Permit NumberBLD20-00399
StatusIssued
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 3036 N NETWORK LN
Project NameBroadview Townhomes
Customer NumberBLD20-00357 & 00397 - 00399
ePlanReview 
Description
***04/09/20 PLAN MODIFICATION to update girder structural support at common wall *** (FOUR PERMITS IN EPLAN UNDER BLD20-00357) Permit for the construction of a new 1797 sq. ft., 3 story (first story 292 sq. ft., second story 792 sq. ft., third story 713 sq. ft.) Townhouse with 2 bedrooms, 2.5 bathrooms, approximately 242 sq. ft. of covered patio/porch and a 738 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Comliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance8/10/20208/10/20208/10/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//east wall 1st floor interior shear wall ok//anchor bolts installed//discussed safety glazing for windows and areas//ok to cover separation wall for shear//
BLD-Framing/Rough-in8/6/20208/6/20208/6/2020PPART
DetailsTell Riley
Foam seal/ Framing Phone #: ###-#### Inspection requested via web by Shane Shade//still need anchor bolts installed//a couple other framing issues noted, see Russell for corrections//ok to insulate the rest of walls//
BLD-Framing/Rough-in8/4/20208/4/20208/4/2020APART
DetailsTell Riley
structural/bearing Phone #: ###-#### Inspection requested via web by Shane Shade//See Russell for notes on corrections for beams, posts, joists,bearing, anchor bolts, and hold downs//ok to insulate separation walls only at this time//this inspection was not a complete framing inspection//
BLD-Framing/Rough-in7/13/20207/13/20207/13/2020APART
DetailsTell Riley
truss/consultation--please call 30 minutes prior Phone #: ###-#### Inspection requested via web by Shane Shade//need to add bracing on 3 trusses that were missed//Shane marked them to be fixed//need to provide engineering for mechanical added to attic//
BLD-Framing/Rough-in7/9/20207/9/20207/9/2020PNR
DetailsTell Riley
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//still need truss bracing installed//CN issued//
BLD-Framing/Rough-in7/2/20207/2/20207/2/2020ANR
DetailsTell Riley
Truss Inspection Phone #: ###-#### Inspection requested via web by Shane Shade//trusses need bracing per the enginering//
BLD-Wall Bracing6/12/20206/12/20206/12/2020APART
DetailsTell Riley
Final shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nails for 3" edge nailing--shane will verify complete prior to installing the remaing house wrap//nail straps where nails are missed//add straps on type 3 shear walls at headers and sill plates per details//other exterior shear nailing areas ok per the plans//
BLD-Wall Bracing6/8/20206/8/20206/8/2020APART
DetailsTell Riley
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
BLD-Wall Bracing6/4/20206/4/20206/4/2020APART
DetailsTell Riley
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD-Concrete4/17/20204/17/20204/17/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//slab vb and insulation installed//
BLD-Foundation4/7/20204/7/20204/7/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade//WIP//
BLD-Footing3/27/20203/27/20203/27/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Shane Shade