BLD-Final | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tell Riley
|
|
|
video inspection // derek Phone #: ###-####//smoke and smoke/Co detectors were verified via ZOOM video inspection//
|
DOC - Permit Finaled | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PART |
Tell Riley
|
|
|
derek Phone #: ###-####//onsite ok looking from exterior//need to add interconnected smoke and smoke/co detectors//Derek will video call when installed//
|
BLD-Energy code compliance | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Tell Riley
|
|
|
Derek Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | PART |
Tell Riley
|
|
|
Derek Phone #: ###-####//ok to insulate only//shear nailing ok// add straps at window headers per plans//need mechanical permit and inspection prior to any cover//
|
BLD-Framing/Rough-in | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | NR |
Tell Riley
|
|
|
Derek Phone #: ###-####//not ready for framing//still need to complete floor framing//discussed shear nailing and isnpection--will call for shear//
|
BLD-Foundation | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Brandon Shaw
|
|
|
Derek Phone #: ###-####
|
BLD-Footing | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Brandon Shaw
|
|
|
Derek Phone #: ###-####
|