BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Mike Jordan
|
|
|
screened - building vacant // Noah Phone #: ###-####
|
BLD-Energy code compliance | 4/22/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Mike Jordan
|
|
|
screened - building vacant // Noah Phone #: ###-####
|
BLD-Framing/Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | FAIL |
Mike Jordan
|
|
|
Screened- house is vacant -Noah Phone #: ###-####. Needs to provide engineering fix for insufficient bearing on G1 truss and install bearing blocks as shown on truss engeering on G1 and G2 truss.
|
BLD-Framing/Rough-in | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | FAIL |
Mike Jordan
|
|
|
Screened- home is vacant- virtual inspection ok- Noah Phone #: ###-####. Provide truss engineering. Strap double top plate breaks from addition to existing. 3 ply G02 truss, plys not in contact. Appears to be insufficient bearing on 6x6 G01 truss. Need truss engineering to verify.. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | NR |
Mike Jordan
|
|
|
screened // Noah Phone #: ###-####. Mech. rough in inspection required prior to framing inspection.
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Mike Jordan
|
|
|
Noa Phone #: ###-####
|
BLD-Wall Bracing | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | DONE |
Mike Jordan
|
|
|
noah - partial shear for the roof Phone #: ###-####
|
BLD-Footing | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Mike Jordan
|
|
|
Noa Phone #: ###-####. Column pad footings for patio cover.
|
BLD-Foundation | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PART |
Mike Jordan
|
|
|
Gadi Phone #: ###-####
|
BLD-Footing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Footing | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | FAIL |
Mike Jordan
|
|
|
Gali Phone #: ###-####. Footings to be 12 inch deep min. per enginering. Also noted footing subgrade is frozen.
|