BLD-Energy code compliance | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Tony Young
|
|
|
Sam *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PART |
Tony Young
|
|
|
Sam Phone #: ###-####// needs fireplace inspection,, nail kingstuds to headers/ plates// brace truss where cut out,, see paint// ok to insulate
|
BLD-Wall Bracing | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PART |
Tony Young
|
|
|
shear // Jedd Phone #: ###-####,, exterior ok to cover
|
BLD-Foundation | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | PASS |
Tony Young
|
|
|
Sam Phone #: ###-####
|
BLD-Foundation | 4/17/2020 | 4/17/2020 | 4/20/2020 | P | DONE |
Tony Young
|
|
|
Sam **cleared** Phone #: ###-####
|
BLD-Footing | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PART |
Tell Riley
|
|
|
Sam Phone #: ###-####//two pins set on nort side prop line, the one marked prop corner meets the 10' setback one at five meets the 5' min setback on site plans, other areas ok//ok to pour when point load footings are moved to correct location in front//
|