BLD-Framing/Rough-in | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. All framing issues corrected. ok to insulate.
|
BLD-Framing/Rough-in | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Remove all plumbing from 2hr. rated walls.fireblock fur downs in downstairs bathroom. No penetrations allowed in laydown parapet. C/N posted.
|
BLD-Conference | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | DONE |
Dave Hannah
|
|
|
Call prior to going Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells plumber cut i joist needs engineering fix or add one next to the that was cut
|
BLD-Other | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. . 5/8 type x rock for fire walls at exterior locations and prerock areas.
|
BLD-Wall Bracing | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Exterior shear only ok. Also met with contractor to discuss firewall issues.
|
BLD-Wall Bracing | 6/10/2020 | 6/12/2020 | 6/12/2020 | A | PART |
Mike Jordan
|
|
|
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Needs to install all missed floor to floor straps, nail missed areas. Also noted issues with installed sheet rock for fire walls as well as continuity issues that need to be addressed prior to proceeding.
|
BLD-Foundation | 4/10/2020 | 4/13/2020 | 4/13/2020 | P | PART |
Mike Jordan
|
|
|
Pat *left voicemail* Phone #: ###-####
|
BLD-Footing | 4/9/2020 | 4/10/2020 | 4/10/2020 | P | PART |
Mike Jordan
|
|
|
screened // Pat Phone #: ###-####
|