Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD20-00658
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 2592 S BEVERLY ST Unit: 130
Project NameWest Airport IP Bldg B STE 130
Customer Number 
ePlanReviewYes
Description
(PARTNER'S INSULATION – BUILDING B – SUITE #130) Permit is to remodel an existing 4,910 sq. ft. tenant space for office/warehouse use (435 sq. ft. Office + 4,331 sq. ft. Warehouse). Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing tenant demising wall, construction of interior non-bearing walls to create an office, a front office and an accessible restroom, new door/door frames, new suspended acoustic and gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20205/15/20205/15/2020APASS
DetailsMike Jordan
call first Phone #: ###-#### Inspection requested via web by Todd Landvatter. Ok for perm occ.
FIRE-Final Inspection5/14/20205/14/20205/14/2020APASS
DetailsTroy Cobbley
Life safety passed. coordinate with Absolute Fire Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Ceiling Grid Inspection5/13/20205/13/20205/13/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter. ceiling grid ok pending electrical rough in inspection.
BLD-Framing/Rough-in4/13/20204/14/20204/14/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter