BLD-Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
Jim Storey
|
|
|
Final Electrical inspection is scheduled for Morning Phone #: ###-#### Inspection requested via web by Scott Hope
|
DOC - Permit Finaled | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/10/2020 | 6/11/2020 | 6/11/2020 | P | DEFR |
Jim Storey
|
|
|
Final Electrical inspection is scheduled for Morning Phone #: ###-#### Inspection requested via web by Scott Hope
|
BLD-Wall cover | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Jim Storey
|
|
|
Contractor will not be onsite. Please meet with homeowner to inspect insulation for coverage Phone #: ###-#### Inspection requested via web by Scott Hope
|
BLD-Framing/Rough-in | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PEND |
Dave Hannah
|
|
|
Can you please call 20 mins before arrival as I will not be on site.I need time to get to job site
Thank YOU Scott Phone #: ###-#### Inspection requested via web by Scott Hope ok to insulate after elec rough in sign off
|
BLD-Other | 4/10/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Jim Storey
|
|
|
Requesting footing inspection and floor pack hanger inspection before covering joists with sub-floor. (note there is not ceiling access from below, due to finished space) Phone #: ###-#### Inspection requested via web by Scott Hope floor framing ok to cover.
|