Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD20-01033
StatusIssued
Name BOISE CITY BUILDING FACILITIES
Site Address 150 N CAPITOL BLVD
Project NameCity Hall 2nd Floor Security
Customer Number 
ePlanReviewYes
Description
(2nd floor City Hall) HCD DEPARTMENT REMODEL - Work to include, installation of security door, installation of glazing on top of exiting partition, miscelaneous related interior finishes. Any alterations or modifications to the sprinkler system will require a separate permit and shall be installed per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/24/20206/25/20206/25/2020PPASS
DetailsDave Hannah
Please call ahead, working elsewhere in bldg -Jeff Phone #: ###-####
FIRE-Final Inspection6/24/20206/25/20206/25/2020APASS
DetailsTroy Cobbley
Life safety passed. Greg performed inspection.

Please call ahead, working elsewhere in bldg -Jeff Phone #: ###-####
BLD-Framing/Rough-in6/11/20206/12/20206/12/2020APASS
DetailsDave Hannah
Screened- Jeff Phone #: ###-####
FIRE-Final Inspection6/11/20206/12/20206/12/2020AFAIL
DetailsJim Page
Fire sprinkler head on the elevator lobby side of door is overspaced, max distance is 7ft 6in off of wall. Need doors and door hardware placed and operational before life fire safety can be signed off.

Screened- Jeff Phone #: ###-####