BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Jim Storey
|
|
|
SCREENED // Vince Phone #: ###-####
|
BLD-Energy code compliance | 7/8/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Jim Storey
|
|
|
SCREENED // Vince Phone #: ###-####
|
BLD-Energy code compliance | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | FAIL |
Brandon Shaw
|
|
|
Truss bracing corrections not met... Fees apply
|
BLD-Conference | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | DONE |
Tell Riley
|
|
|
conference to discusse framing//ok to insulate//check framing corrections at the energy inspection//
|
BLD-Framing/Rough-in | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PART |
Tell Riley
|
|
|
screened // Vince Phone #: ###-####//based on new information provided,,still need a few things corrected, trus bracing, bearing etc//CN posted for details//ok to insulate//
|
BLD-Framing/Rough-in | 6/11/2020 | 6/12/2020 | 6/12/2020 | P | FAIL |
Brandon Shaw
|
|
|
Corrections not met, see correction notice and truss lay-out...
|
BLD-Framing/Rough-in | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | FAIL |
Tell Riley
|
|
|
Vince Phone #: ###-####//CN issued for framing corrections-see corrections onsite//
|
BLD-Wall Bracing | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PART |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Foundation | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Tell Riley
|
|
|
wall // Vince Phone #: ###-####
|
BLD-Footing | 4/17/2020 | 4/20/2020 | 4/20/2020 | P | PART |
Tell Riley
|
|
|
screened // Pat Phone #: ###-####//ok when rebar added to back for hold downs// setbacks per plans//
|