BLD-Conference | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | DONE |
Tell Riley
|
|
|
met Lloyd with Point roofing on a differnet job, let him know concerns with this project, he said he would get someone to look at the issue and get back with me//possibly flash under vents to prevent wind driven rain to enter the flashing-showed him photos of the project//
|
BLD-Conference | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | DONE |
Tell Riley
|
|
|
Rich ###-####//looked at roofing concerns from Rich//mostly cosmetic issues, vent holes may be paritially covered//he will send photos//
|
BLD-Other | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | DONE |
Tell Riley
|
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
DOC - Permit Finaled | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Tell Riley
|
|
|
roof appears to be installed within code requirements//no access to back//
|