BLD-Framing/Rough-in | 8/3/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Tell Riley
|
|
|
This is for framing inspection of both garages, also fire seal of the separation walls on both garage units.
Phone #: ###-#### Inspection requested via web by Joel Hirtletruss repair document reviewed//putty pad added to recepticles per the super, fire cualk was used at wall penetrations//ok to cover//
|
BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD-Wall Bracing | 7/5/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 | A | PART |
Tell Riley
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD-Conference | 6/4/2020 | 6/5/2020 | 6/5/2020 | P | PART |
Tell Riley
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //WIP//pins set to measure 2' setback per the plat//met Ricardo and measured earlier today--crew will set strings at 2' setback for foundation inspection to confirm setbacks//
|
BLD-Footing | 6/1/2020 | 6/2/2020 | 6/1/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo
|