BLD-Energy code compliance | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Johnson
|
BLD-Framing/Rough-in | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 7/14/2020 | 7/16/2020 | 7/16/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Johnson
|
BLD-Framing/Rough-in | 7/13/2020 | 7/14/2020 | 7/14/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Johnson. Roll block 2nd. floor joist at glue lam beam in garage. strap 4x8 header in hall at stair side and roll blocl floor joist at 4x8 header. Complete fire blocking around flex duct work at 2nd floor ceiling adjacent to tube above stairs. Complete foam seal around oval duct 2nd. floor.. C/N posted. Ok to insulate.
|
BLD-Wall Bracing | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Allen Jones. Exterior wall bracing ok. Needs to sheet common wall in garage. Will verify on framing inspection.
|
BLD-Foundation | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2004207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 6/3/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Brandon Shaw
|
|
|