BLD-Final | 6/5/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Dexter// will get a permit to wire lights later,,
|
DOC - Permit Finaled | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PART |
Tell Riley
|
|
|
Hoping for AM! Phone #: ###-#### Inspection requested via web by David Dexter//ok when all the screws have been installed per plans//they were adding the screws when I left//this inspections was of mechanical connections at existing truss tails//
|
BLD-Framing/Rough-in | 5/22/2020 | 5/26/2020 | 5/26/2020 | P | NR |
Tell Riley
|
|
|
Inspection requested EARLY PM if at all possible please. Footing inspection requested simultaneously. Phone #: ###-#### Inspection requested via web by David Dexter//a34 are installed, let them know plans show an a35 on each truss tail as well, will need to see those installed//
|
BLD-Footing | 5/22/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Tell Riley
|
|
|
Inspection requested EARLY PM if at all possible please. Framing inspection requested simultaneously. Phone #: ###-#### Inspection requested via web by David Dexter//ok per plans, when all holes have been cleaned//
|