BLD-Footing | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Cameron Brown
|
BLD-Footing | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | NR |
Tell Riley
|
|
|
screened// Cameron Phone #: ###-####//rebar still not per plans//
|
BLD-Foundation | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | NR |
Tell Riley
|
|
|
Screened- Cameron Phone #: ###-####/7035706//rebar needs to be installed per the engineering alternate detail// a knife plate will be post installed into the pier//
|
BLD-Footing | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | NR |
Tell Riley
|
|
|
Cameron *screened* Phone #: ###-####//need to provide alternate footing design from engineer for monopour//let contractor and homeowner know//
|
BLD-Footing | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Cameron Brown//need approved plans onsite//footings need to reflect approved plans//
|