INSP - Final | 4/30/1996 | 5/1/1996 | 5/1/1996 | A | PASS |
Jim Storey
|
|
|
04/30/96 301 - 10:30 APPOINTMENT TCO -TEMP C OF O ISSUED OTH-OTHER AGENCIES NOT APPROVED same as bld95-0199.
|
INSP - Final | 4/29/1996 | 4/29/1996 | 4/29/1996 | P | FAIL |
Jim Storey
|
|
|
04/29/96 301 - SOUTH BLDG. LOWER UNIT - PLANS & OCC. CARDS. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 4/3/1996 | 4/4/1996 | 4/4/1996 | A | FAIL |
|
|
|
FINAL REINSPECT
|
INSP - Final | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | FAIL |
|
|
|
correction notice posted. no signatures on card.
|
INSP - Conference | 11/13/1995 | 11/13/1995 | 11/13/1995 | | PASS |
|
|
|
/ / 338 - UPDATEWP
|
INSP - Framing/Rough-in | 11/8/1995 | 11/8/1995 | 11/8/1995 | P | PASS |
|
|
|
|
INSP - Footings | 8/18/1995 | 8/21/1995 | 8/21/1995 | A | PASS |
|
|
|
08/18/95 338 - MADE OK FOR THE STAIR WALLS R-BAR PLACED
|
INSP - Foundation | 8/21/1995 | 8/21/1995 | 8/21/1995 | P | PASS |
|
|
|
08/21/95 338 - B-BAR PLACED
|
INSP - Foundation | 8/9/1995 | 8/9/1995 | 8/9/1995 | P | PASS |
|
|
|
08/09/95 338 - r-bare placed per plan
|
INSP - Footings | 8/7/1995 | 8/7/1995 | 8/7/1995 | P | PASS |
|
|
|
08/07/95 338 -
|
INSP - Footings | 8/7/1995 | 8/7/1995 | 8/7/1995 | | PASS |
|
|
|
/ / 338 - made ok
|
INSP - Footings | 8/2/1995 | 8/2/1995 | 8/2/1995 | P | NR |
Jim Storey
|
|
|
08/02/95 301 -
|