INSP - Final | 10/7/1996 | 10/9/1996 | 10/9/1996 | P | NR |
Wes Worcester
|
|
|
still needs mechanical
|
INSP - Final | 10/7/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
|
|
|
10/09/96 405 - HERB - ###-####
|
INSP - Final | 9/12/1996 | 9/12/1996 | 9/12/1996 | | PART |
|
|
|
/ / 405 - retest alarms.....trouble signal now separate
|
INSP - Framing/Rough-in | 9/11/1996 | 9/12/1996 | 9/12/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Carpentry | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | PASS |
Wes Worcester
|
|
|
ck'd 1 Hr const
|
INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PART |
|
|
|
/ / 405 - REINSPECTION CALLED BY HERB TEMP OCC APPROVED
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PART |
|
|
|
/ / 405 - NOT READY...ALARM SYS PROBLEMS....SPRINKLER OK
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | NR |
Wes Worcester
|
|
|
fire dept not signed off
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | PART |
Wes Worcester
|
|
|
alarm test ok
|
INSP - Final | 9/4/1996 | 9/5/1996 | 9/5/1996 | P | FAIL |
Wes Worcester
|
|
|
FINAL ON PHASE III. no fire dept final
|
INSP - Wall cover | 8/1/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
Wes Worcester
|
|
|
I DON'T SHOW THIS AS BEING YOUR AREA, BUT HE SAID YOU WANT TO DO IT. AJB
|
INSP - Framing/Rough-in | 7/29/1996 | 7/29/1996 | 7/29/1996 | P | PART |
Wes Worcester
|
|
|
corridor wall ok
|
INSP - Conference | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | FAIL |
Wes Worcester
|
|
|
discussed 1 hr construction w/Herb. He still doesn't understand and said we did not do it that way previously. We will look and correct othres as necessary to maintain continous membrane 1 hr criteria w/openings protected.
|
INSP - Conference | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | PASS |
Wes Worcester
|
|
|
discussed l/c #11388 w/hartman
|
INSP - Letter of compliance | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | PASS |
Wes Worcester
|
|
|
faxed copy to Hartman
|
INSP - Letter of compliance | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | PASS |
Wes Worcester
|
|
|
faxed copy to Hartman
|
INSP - Framing/Rough-in | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | FAIL |
Wes Worcester
|
|
|
c/n still not done that was posted earlier
|
INSP - Letter of compliance | 7/19/1996 | 7/19/1996 | 7/19/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Letter of compliance | 7/19/1996 | 7/19/1996 | 7/19/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Partial final | 7/18/1996 | 7/19/1996 | 7/19/1996 | A | PASS |
Wes Worcester
|
|
|
stg/maint bldg in rear
|
INSP - Wall cover | 7/17/1996 | 7/18/1996 | 7/18/1996 | P | NR |
Wes Worcester
|
|
|
pre-cover
|
INSP - Partial final | 7/8/1996 | 7/9/1996 | 7/9/1996 | P | PART |
Wes Worcester
|
|
|
PM 4 bdrms only
|
INSP - Final | 6/26/1996 | 6/27/1996 | 6/27/1996 | A | NR |
Wes Worcester
|
|
|
unable to install "tent assembly" as drawn for 1 hr ceiling and fire dept not signed off
|
INSP - Conference | 6/10/1996 | 6/11/1996 | 6/11/1996 | P | NR |
Wes Worcester
|
|
|
06/11/96 342 - 3:00 TUESDAY
|
INSP - Conference | 6/7/1996 | 6/10/1996 | 6/10/1996 | P | CANC |
Jim Sly
|
|
|
06/07/96 316 - canceled
|
INSP - Conference | 6/7/1996 | 6/10/1996 | 6/10/1996 | P | CANC |
Wes Worcester
|
|
|
06/07/96 342 - CONFERENCE WITH FIRE DEPT. AT 3:00 P.M. RE CHECKING OUT S
|
INSP - Framing/Rough-in | 5/31/1996 | 6/3/1996 | 5/28/1996 | A | PART |
Wes Worcester
|
|
|
05/31/96 342 - alcove wall East side only
|
INSP - Partial final | 5/8/1996 | 5/9/1996 | 5/3/1996 | P | PART |
Wes Worcester
|
|
|
05/08/96 342 - PARTIAL FINAL THURS PM 147 swr rm ok
|
INSP - Partial final | 4/24/1996 | 4/25/1996 | 4/20/1996 | P | FAIL |
Wes Worcester
|
|
|
04/25/96 342 - 1 hr penetration not addressed, smk detrs not installed, done, phased construction time & design addressed, not approved for occu
|
INSP - Framing/Rough-in | 4/8/1996 | 4/9/1996 | 4/9/1996 | A | PASS |
Jim Sly
|
|
|
Bathrooms South East corridor....West side. Archway in same corridor.
|
INSP - Framing/Rough-in | 4/8/1996 | 4/9/1996 | 4/9/1996 | A | PART |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 4/1/1996 | 4/1/1996 | 4/1/1996 | P | PASS |
Jim Sly
|
|
|
04/01/96 316 - Inspection of 4 Bathrooms ...S. E. corridor..W.side.
|
INSP - Conference | 3/29/1996 | 3/29/1996 | 3/29/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Meeting with Herb Booth, Roger Hartman, Dwight from samaritan, Dan Stuart, Jim Sly and Wes Worcester.
|
INSP - Framing/Rough-in | 3/28/1996 | 3/29/1996 | 3/29/1996 | A | PASS |
Jim Sly
|
|
|
03/28/96 316 - Looked at gyp backing and elect. putty packs for Bath/corridor walls....phase 2...OK.
|
INSP - Framing/Rough-in | 4/1/1996 | 4/1/1996 | 3/28/1996 | P | PART |
Wes Worcester
|
|
|
04/01/96 342 - still in process of nailing 7" o.c. and checking rated dr
|
INSP - Conference | 3/19/1996 | 3/19/1996 | 3/19/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Met with Dave Lightfoot to do a partial Mecanical final for rooms 153-156.
|
INSP - Partial final | 3/19/1996 | 3/19/1996 | 3/19/1996 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Partial final for rooms #153-156.....Checked fire caulking around penitrations and electrical boxes..Corridor wall, Protective devices on sink drains and hot supply... Waiting for approv
|
INSP - Partial final | 3/15/1996 | 3/18/1996 | 3/18/1996 | A | FAIL |
Jim Sly
|
|
|
03/15/96 316 - 8:30 AM. APPOINTMENT Correction notice for 4 rooms..153-1 Needs approval from fire dept.
|
INSP - Partial final | 3/15/1996 | 3/18/1996 | 3/14/1996 | A | FAIL |
Wes Worcester
|
|
|
03/15/96 342 - 8:30 AM APPOINTMENT - MADE BY JIM SLY.
|
INSP - Final | 3/15/1996 | 3/15/1996 | 3/11/1996 | P | NR |
Wes Worcester
|
|
|
03/15/96 342 - PM LATE
|
INSP - Wall cover | 2/12/1996 | 2/13/1996 | 2/13/1996 | A | PART |
Wes Worcester
|
|
|
CHECK SCREWS ON SHEETROCK NAILING.....
|
INSP - Wall cover | 2/12/1996 | 2/13/1996 | 2/13/1996 | A | PASS |
Jim Sly
|
|
|
CHECK SCREWS ON SHEETROCK NAILING..... New bldg. 1st layer ceiling OK.
|
INSP - Framing/Rough-in | 2/9/1996 | 2/9/1996 | 2/9/1996 | P | PART |
Wes Worcester
|
|
|
bathrooms ok to cover, will ck nailing of rock
|
INSP - Framing/Rough-in | 1/26/1996 | 1/26/1996 | 1/26/1996 | P | FAIL |
Wes Worcester
|
|
|
not ready and architect still has not submitted changes
|
INSP - Framing/Rough-in | 1/26/1996 | 1/26/1996 | 1/26/1996 | P | FAIL |
Jim Sly
|
|
|
Wes and I looked at 1 hr wall adjacent to Med room.... needs to fire caulk, repair holes and penitrations, install penitration protection. Not ready for cover at bathroom areas.
|
INSP - Framing/Rough-in | 1/10/1996 | 1/10/1996 | 1/10/1996 | P | PASS |
Jim Sly
|
|
|
Looked at roof framing (joists) at storage bldg. Jim Sly
|
INSP - Footings | 1/5/1996 | 1/8/1996 | 1/8/1996 | A | PASS |
Jim Sly
|
|
|
REBAR OK checked by MTI
|
INSP - Roof | 1/5/1996 | 1/8/1996 | 1/8/1996 | A | NH |
Jim Storey
|
|
|
01/05/96 301 - ROOF INSP.
|
INSP - Footings | 1/3/1996 | 1/3/1996 | 1/3/1996 | P | NR |
Jim Storey
|
|
|
01/03/96 301 -
|
INSP - Foundation | 1/3/1996 | 1/3/1996 | 1/3/1996 | A | PASS |
Jim Sly
|
|
|
Fnd walls, rebar, for West ramp...OK
|
INSP - Conference | 12/15/1995 | 12/18/1995 | 12/18/1995 | A | PASS |
Jim Sly
|
|
|
MONDAY - 1:30 PM. Jim and Wes Met with Scott Hedrick Const. their subs, and architect.
|
INSP - Conference | 12/8/1995 | 12/8/1995 | 12/8/1995 | | PASS |
Jim Sly
|
|
|
|
INSP - Carpentry | 12/5/1995 | 12/5/1995 | 12/5/1995 | | FAIL |
Jim Sly
|
|
|
Jim and Wes inspection for type five one-hour requirments, of upgraded sections of building as per plan. Multiple corrections.
|
INSP - Conference | 12/4/1995 | 12/5/1995 | 12/5/1995 | A | PART |
Wes Worcester
|
|
|
12/05/95 342 - 8:30 APT. 2 1/2 hr conf with a 3 pg c/n issued on framing
|
INSP - Conference | 12/4/1995 | 12/5/1995 | 12/5/1995 | A | PASS |
Jim Sly
|
|
|
8:30 APT. Jim and Wes conferance.
|
INSP - Framing/Rough-in | 12/4/1995 | 12/5/1995 | 12/5/1995 | A | FAIL |
Wes Worcester
|
|
|
12/05/95 342 - 8:30 APT. 3 page c/n. basically not doing 1 hr constructi compromised corridor and 2 hr area separation walls.
|
INSP - Conference | 11/15/1995 | 11/15/1995 | 11/15/1995 | | PASS |
Jim Sly
|
|
|
|
INSP - Framing/Rough-in | 10/17/1995 | 10/17/1995 | 11/7/1995 | P | NR |
Carl Dependahl
|
|
|
10/17/95 340 -
|
INSP - Footings | 10/12/1995 | 10/13/1995 | 11/7/1995 | A | PART |
Carl Dependahl
|
|
|
10/13/95 340 -
|