Permit Information
Permit NumberBLD95-00241
StatusFinaled
Name BOISE SAMARITAN VILLAGE
Site Address 3115 N SYCAMORE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel the bathrooms in the patient rooms in the South Wing of the Good Samaritan Village Nursing Home to comply with the Americans With Disabilities Act and repair other existing bathrooms for general maintenance, as indicated on the plans. To refinish 420 linear feet of corridor to comply with Table's 42-A & B, 1991 UBC. To install 420 linear feet of new suspended ceiling in the corridor below the one hour rated corridor ceiling. To revamp the air conditioning & ventilation of the main nursing wing as indicated on the plans. To construct a 620 square foot storage facility addition to include a new loading dock and ramp. To alter existing interior exit doors by removing doors not need across the corridor or to install opposite swing double doors, with panic hardware, at the locations where the doors are part of the Area Separation walls that cross the corridors. To replace an existing access and egress ramp to comply with ADA requirements. All per approved plans and notes. Separate Electrical, Plumbing and Mechanical permits are required. Separate plans and permits are required prior to doing any other remodel or upgrade work. This permit does not cover items discussed in the Building Code Review done by Lenny Kemnitz unless specifically referenced in the body of the project description above. NOTE: This building is fully fire sprinklered. drs INITIAL CERTIFICATE OF VALUE ON FILE. STRUCT $548,581 ELEC $46,375 PLM $184,265
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/7/199610/9/199610/9/1996PNR
DetailsWes Worcester
still needs mechanical
INSP - Final10/7/199610/9/199610/9/1996PPASS
Details
10/09/96 405 - HERB - ###-####
INSP - Final9/12/19969/12/19969/12/1996 PART
Details
/ / 405 - retest alarms.....trouble signal now separate
INSP - Framing/Rough-in9/11/19969/12/19969/12/1996PPASS
DetailsWes Worcester
INSP - Carpentry9/6/19969/6/19969/6/1996PPASS
DetailsWes Worcester
ck'd 1 Hr const
INSP - Conference9/6/19969/6/19969/6/1996ANR
DetailsWes Worcester
INSP - Final9/6/19969/6/19969/6/1996 PART
Details
/ / 405 - REINSPECTION CALLED BY HERB TEMP OCC APPROVED
INSP - Final9/6/19969/6/19969/6/1996 PART
Details
/ / 405 - NOT READY...ALARM SYS PROBLEMS....SPRINKLER OK
INSP - Final9/6/19969/6/19969/6/1996PNR
DetailsWes Worcester
fire dept not signed off
INSP - Final9/6/19969/6/19969/6/1996PPART
DetailsWes Worcester
alarm test ok
INSP - Final9/4/19969/5/19969/5/1996PFAIL
DetailsWes Worcester
FINAL ON PHASE III. no fire dept final
INSP - Wall cover8/1/19968/2/19968/2/1996APASS
DetailsWes Worcester
I DON'T SHOW THIS AS BEING YOUR AREA, BUT HE SAID YOU WANT TO DO IT. AJB
INSP - Framing/Rough-in7/29/19967/29/19967/29/1996PPART
DetailsWes Worcester
corridor wall ok
INSP - Conference7/25/19967/25/19967/25/1996PFAIL
DetailsWes Worcester
discussed 1 hr construction w/Herb. He still doesn't understand and said we did not do it that way previously. We will look and correct othres as necessary to maintain continous membrane 1 hr criteria w/openings protected.
INSP - Conference7/25/19967/25/19967/25/1996PPASS
DetailsWes Worcester
discussed l/c #11388 w/hartman
INSP - Letter of compliance7/25/19967/25/19967/25/1996PPASS
DetailsWes Worcester
faxed copy to Hartman
INSP - Letter of compliance7/25/19967/25/19967/25/1996PPASS
DetailsWes Worcester
faxed copy to Hartman
INSP - Framing/Rough-in7/22/19967/22/19967/22/1996PFAIL
DetailsWes Worcester
c/n still not done that was posted earlier
INSP - Letter of compliance7/19/19967/19/19967/19/1996PPASS
DetailsWes Worcester
INSP - Letter of compliance7/19/19967/19/19967/19/1996PPASS
DetailsWes Worcester
INSP - Partial final7/18/19967/19/19967/19/1996APASS
DetailsWes Worcester
stg/maint bldg in rear
INSP - Wall cover7/17/19967/18/19967/18/1996PNR
DetailsWes Worcester
pre-cover
INSP - Partial final7/8/19967/9/19967/9/1996PPART
DetailsWes Worcester
PM 4 bdrms only
INSP - Final6/26/19966/27/19966/27/1996ANR
DetailsWes Worcester
unable to install "tent assembly" as drawn for 1 hr ceiling and fire dept not signed off
INSP - Conference6/10/19966/11/19966/11/1996PNR
DetailsWes Worcester
06/11/96 342 - 3:00 TUESDAY
INSP - Conference6/7/19966/10/19966/10/1996PCANC
DetailsJim Sly
06/07/96 316 - canceled
INSP - Conference6/7/19966/10/19966/10/1996PCANC
DetailsWes Worcester
06/07/96 342 - CONFERENCE WITH FIRE DEPT. AT 3:00 P.M. RE CHECKING OUT S
INSP - Framing/Rough-in5/31/19966/3/19965/28/1996APART
DetailsWes Worcester
05/31/96 342 - alcove wall East side only
INSP - Partial final5/8/19965/9/19965/3/1996PPART
DetailsWes Worcester
05/08/96 342 - PARTIAL FINAL THURS PM 147 swr rm ok
INSP - Partial final4/24/19964/25/19964/20/1996PFAIL
DetailsWes Worcester
04/25/96 342 - 1 hr penetration not addressed, smk detrs not installed, done, phased construction time & design addressed, not approved for occu
INSP - Framing/Rough-in4/8/19964/9/19964/9/1996APASS
DetailsJim Sly
Bathrooms South East corridor....West side. Archway in same corridor.
INSP - Framing/Rough-in4/8/19964/9/19964/9/1996APART
DetailsWes Worcester
INSP - Framing/Rough-in4/1/19964/1/19964/1/1996PPASS
DetailsJim Sly
04/01/96 316 - Inspection of 4 Bathrooms ...S. E. corridor..W.side.
INSP - Conference3/29/19963/29/19963/29/1996 PASS
DetailsJim Sly
/ / 316 - Meeting with Herb Booth, Roger Hartman, Dwight from samaritan, Dan Stuart, Jim Sly and Wes Worcester.
INSP - Framing/Rough-in3/28/19963/29/19963/29/1996APASS
DetailsJim Sly
03/28/96 316 - Looked at gyp backing and elect. putty packs for Bath/corridor walls....phase 2...OK.
INSP - Framing/Rough-in4/1/19964/1/19963/28/1996PPART
DetailsWes Worcester
04/01/96 342 - still in process of nailing 7" o.c. and checking rated dr
INSP - Conference3/19/19963/19/19963/19/1996 PASS
DetailsJim Sly
/ / 316 - Met with Dave Lightfoot to do a partial Mecanical final for rooms 153-156.
INSP - Partial final3/19/19963/19/19963/19/1996 FAIL
DetailsJim Sly
/ / 316 - Partial final for rooms #153-156.....Checked fire caulking around penitrations and electrical boxes..Corridor wall, Protective devices on sink drains and hot supply... Waiting for approv
INSP - Partial final3/15/19963/18/19963/18/1996AFAIL
DetailsJim Sly
03/15/96 316 - 8:30 AM. APPOINTMENT Correction notice for 4 rooms..153-1 Needs approval from fire dept.
INSP - Partial final3/15/19963/18/19963/14/1996AFAIL
DetailsWes Worcester
03/15/96 342 - 8:30 AM APPOINTMENT - MADE BY JIM SLY.
INSP - Final3/15/19963/15/19963/11/1996PNR
DetailsWes Worcester
03/15/96 342 - PM LATE
INSP - Wall cover2/12/19962/13/19962/13/1996APART
DetailsWes Worcester
CHECK SCREWS ON SHEETROCK NAILING.....
INSP - Wall cover2/12/19962/13/19962/13/1996APASS
DetailsJim Sly
CHECK SCREWS ON SHEETROCK NAILING..... New bldg. 1st layer ceiling OK.
INSP - Framing/Rough-in2/9/19962/9/19962/9/1996PPART
DetailsWes Worcester
bathrooms ok to cover, will ck nailing of rock
INSP - Framing/Rough-in1/26/19961/26/19961/26/1996PFAIL
DetailsWes Worcester
not ready and architect still has not submitted changes
INSP - Framing/Rough-in1/26/19961/26/19961/26/1996PFAIL
DetailsJim Sly
Wes and I looked at 1 hr wall adjacent to Med room.... needs to fire caulk, repair holes and penitrations, install penitration protection. Not ready for cover at bathroom areas.
INSP - Framing/Rough-in1/10/19961/10/19961/10/1996PPASS
DetailsJim Sly
Looked at roof framing (joists) at storage bldg. Jim Sly
INSP - Footings1/5/19961/8/19961/8/1996APASS
DetailsJim Sly
REBAR OK checked by MTI
INSP - Roof1/5/19961/8/19961/8/1996ANH
DetailsJim Storey
01/05/96 301 - ROOF INSP.
INSP - Footings1/3/19961/3/19961/3/1996PNR
DetailsJim Storey
01/03/96 301 -
INSP - Foundation1/3/19961/3/19961/3/1996APASS
DetailsJim Sly
Fnd walls, rebar, for West ramp...OK
INSP - Conference12/15/199512/18/199512/18/1995APASS
DetailsJim Sly
MONDAY - 1:30 PM. Jim and Wes Met with Scott Hedrick Const. their subs, and architect.
INSP - Conference12/8/199512/8/199512/8/1995 PASS
DetailsJim Sly
INSP - Carpentry12/5/199512/5/199512/5/1995 FAIL
DetailsJim Sly
Jim and Wes inspection for type five one-hour requirments, of upgraded sections of building as per plan. Multiple corrections.
INSP - Conference12/4/199512/5/199512/5/1995APART
DetailsWes Worcester
12/05/95 342 - 8:30 APT. 2 1/2 hr conf with a 3 pg c/n issued on framing
INSP - Conference12/4/199512/5/199512/5/1995APASS
DetailsJim Sly
8:30 APT. Jim and Wes conferance.
INSP - Framing/Rough-in12/4/199512/5/199512/5/1995AFAIL
DetailsWes Worcester
12/05/95 342 - 8:30 APT. 3 page c/n. basically not doing 1 hr constructi compromised corridor and 2 hr area separation walls.
INSP - Conference11/15/199511/15/199511/15/1995 PASS
DetailsJim Sly
INSP - Framing/Rough-in10/17/199510/17/199511/7/1995PNR
DetailsCarl Dependahl
10/17/95 340 -
INSP - Footings10/12/199510/13/199511/7/1995APART
DetailsCarl Dependahl
10/13/95 340 -