INSP - Partial final | 5/22/1996 | 5/23/1996 | 5/24/1996 | P | FAIL |
|
|
|
05/22/96 333 - T/O REQUEST. placed cn
|
INSP - Conference | 5/15/1996 | 5/16/1996 | 5/16/1996 | A | PASS |
|
|
|
talked with Jack about final
|
INSP - Framing/Rough-in | 4/3/1996 | 4/4/1996 | 4/4/1996 | P | CANC |
Carl Dependahl
|
|
|
04/04/96 340 - 333 AREA
|
INSP - Framing/Rough-in | 3/21/1996 | 3/22/1996 | 3/25/1996 | A | PASS |
|
|
|
03/22/96 333 - PARTIAL FRAMING FRIDAY AM. stairway west ok
|
INSP - Conference | 2/23/1996 | 2/23/1996 | 2/26/1996 | P | PASS |
|
|
|
02/23/96 333 -
|
INSP - Framing/Rough-in | 2/8/1996 | 2/9/1996 | 2/9/1996 | A | PART |
|
|
|
02/08/96 333 - COULD YOU PLEASE GET THIS ONE FIRST?? HE CALLED IN FOR TH AND BOB SAID HOLD OFF....SO I AM GOING TO LET YOU DO IT???? FRAM-OK FRAMING all of top floor ex
|
INSP - Framing/Rough-in | 2/8/1996 | 2/9/1996 | 2/9/1996 | A | CANC |
|
|
|
02/08/96 333 - PLEASE DO THIS FIRST THING ALSO.....
|
INSP - Flatwork | 1/31/1996 | 1/31/1996 | 1/31/1996 | | PASS |
Bob Archibald
|
|
|
|
INSP - Conference | 12/21/1995 | 12/21/1995 | 12/21/1995 | | PASS |
Bob Archibald
|
|
|
ON PROPOSED CHANGES AND STAGING OF WORK.
|