Permit NumberBLD95-00649
StatusFinaled
Name THE HERTZ CORPORATION
Site Address 700 W DIAMOND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To finish the interior of a 9,689 Square foot shell to be a shop / warehouse building with supporting office, waiting and reception areas as indicated on the approved plans and attached plan review correction sheet(s). Office /support areas 2519 sq. ft & shop / warehouse area 7299 sq. ft. This building is fully fire sprinklered. Separate permits required for electrical, plumbing and mechanical work. PC381-95 drs (1991 UBC) This building has combustible liquids of 10 gallons of gasoline store in an approved can in a listed cabinet; 200 gal. of motor oil in dbl. wall storage tank; 400 gal. of hydraulic oil stored in a dbl. wall tank & a maximum of two tank of acytlene gas. A 4000 gal. diesel, above ground, dbl. wall storage tank is located at plus 25 feet from the building as shown on plan and H Occupancy Questionnaire completed and submitted by Hertz Equipment Rental Corp. There will also be some welding in the shop. Pendinf Fire Dept review this building is classified as an H-4/B-2 Mixed Occupany INITIAL CERTIFICATE OF VALUE ON FILE. ELEC. 27,475 PLG. N/A MEC. 8,625. COMB PLG/MECH. 9,350 FIRE SPRK. 2,288
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/25/199510/26/199510/26/1995APASS
Details
/ / 338 -
INSP - Footings10/10/199510/10/199510/9/1995PPASS
Details
10/10/95 338 -
INSP - Framing/ Rough-in10/2/199510/2/199510/2/1995 PASS
Details
/ / 338 - RGHN-OK ROUGH IN
INSP - Framing/ Rough-in9/20/19959/21/19959/21/1995APART
Details
09/21/95 338 - need elec rough passed before cover
INSP - Foundation9/12/19959/12/19959/12/1995PPASS
Details
09/12/95 338 - REBAR SPECIAL INSP PASSED R-BAR PLACED
INSP - Flatwork9/11/19959/11/19959/11/1995PPASS
Details
09/11/95 338 - OK TO POUR OTHER AGENCIES OK SLAB-OK SLAB
INSP - Foundation8/31/19959/1/19959/1/1995P
DetailsJim Sly
INSP - Footings8/29/19958/30/19958/29/1995APASS
Details
08/29/95 338 - made ok r-bar placed FRMS-OK FORMS-REBAR