INSP - Letter of compliance | | | 2/27/1996 | | PASS |
|
|
|
ISSUED #10921 C OF C BY MJW THIS DATE.
|
INSP - Final | 2/26/1996 | 2/26/1996 | 2/26/1996 | | PASS |
|
|
|
/ / 333 - FNL -OK FINAL ok to issue l/c
|
INSP - Final | 2/15/1996 | 2/15/1996 | 2/15/1996 | | FAIL |
Bob Archibald
|
|
|
no access posted structure
|
INSP - Final | 2/8/1996 | 2/9/1996 | 2/9/1996 | A | CANC |
Wes Worcester
|
|
|
Transfer to Bob A.
|
INSP - Final | 2/9/1996 | 2/9/1996 | 2/9/1996 | | FAIL |
Bob Archibald
|
|
|
no access
|
INSP - Partial final | 1/18/1996 | 1/18/1996 | 1/18/1996 | | PART |
Bob Archibald
|
|
|
approved for temp. occ. only in main level unit #515. CN ISSUED.
|
INSP - Energy code compliance | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 12/27/1995 | 12/28/1995 | 1/4/1996 | P | FAIL |
Wes Worcester
|
|
|
12/28/95 342 - full page of c/n
|
INSP - Energy code compliance | 1/2/1996 | 1/3/1996 | 1/3/1996 | | PASS |
Bob Archibald
|
|
|
342 did insp for 325
|
INSP - Framing/Rough-in | 12/27/1995 | 12/27/1995 | 12/28/1995 | P | PASS |
Wes Worcester
|
|
|
12/27/95 342 -
|
INSP - Conference | 12/20/1995 | 12/20/1995 | 12/20/1995 | | PASS |
Bob Archibald
|
|
|
ON ELEC. PANEL REQUIREMENTS IN GARAGE WALL (FIREBLOCK)
|
INSP - Conference | 11/15/1995 | 11/15/1995 | 11/15/1995 | | PASS |
Bob Archibald
|
|
|
ON FIREBLOCKING, 1HR CONST., & WALL BRACING.
|
INSP - Foundation | 10/3/1995 | 10/3/1995 | 10/3/1995 | | PASS |
Bob Archibald
|
|
|
|
INSP - Footings | 9/29/1995 | 9/29/1995 | 9/29/1995 | | PASS |
Bob Archibald
|
|
|
made ok
|
INSP - Site Preparation | 9/25/1995 | 9/25/1995 | 9/25/1995 | | PASS |
Dan Overy
|
|
|
|
INSP - Site Preparation | 9/25/1995 | 9/25/1995 | 9/25/1995 | | PASS |
Dan Overy
|
|
|
Portion of old concrete cellar all debris removed filled with pit run compaction being performed
|
INSP - Conference | 9/19/1995 | 9/19/1995 | 9/19/1995 | | PASS |
Bob Archibald
|
|
|
On site prep. and unknown soil conditions. instructed contractor to excavate and call when footings ready.
|