INSP - Final | 4/18/1996 | 4/19/1996 | 4/19/1996 | A | PASS |
Jim Sly
|
|
|
04/18/96 316 - C/C #10569
|
INSP - Letter of compliance | 4/19/1996 | 4/19/1996 | 4/19/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C #10569
|
INSP - Letter of compliance | 4/19/1996 | 4/19/1996 | 4/19/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C #10569
|
INSP - Final | 4/1/1996 | 4/1/1996 | 4/1/1996 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Correction notice for final...unscheduled inspection while a site for final mechanical. elect.and plumb. OK.
|
INSP - Framing/Rough-in | 2/29/1996 | 2/29/1996 | 2/29/1996 | P | PASS |
Jim Sly
|
|
|
OK to cover...acception, master bath wall for installation and inspection of header..... only detected after the builder finally brought plans.
|
INSP - Framing/Rough-in | 2/27/1996 | 2/27/1996 | 2/27/1996 | P | FAIL |
Jim Sly
|
|
|
correction notice.
|
INSP - Footings | 1/11/1996 | 1/11/1996 | 1/11/1996 | P | PASS |
Jim Sly
|
|
|
|