TO CONSTRUCT A 8761 SF TWO STORY WITH FULL BASEMENT NEW SINGLE FAMILY DWELLING AND AN ATTACHED 1008 SF THREE CAR GARAGE WITH 492 SF OF COVERED BREEZEWAY TO HOME AND A 1728 SF COVERED SHELL FOR A SWIMMING POOL AND 1044 SF OF CONCRETE DECK/PATIO PER ATTACHED APPROVED PLANS AND REQUIREMENT LIST. (FIRST FLOOR 3158 SF) (SECOND FLOOR 2443 SF) (BASEMENT 3160 SF). NOTE: ALL HILSIDE REQUIREMENTS APPLY ON THIS LOT. FINAL GRADING AND DRAINAGE INSPECTIONS MUST BE DONE BY THE DESIGNING ENGINEER AND PUBLIC WORKS DEPARTMENT OF THE CITY OF BOISE AND AN APPROVAL LETTER SUBMITTED TO THE BUILDING DEPARTMENT PRIOR TO APPROVAL FOR OCCUPANCY. PLAN CHECK # 0503. ACHD # 0730. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired  9/7/2006 DONE
INSP - Final10/23/199610/22/199610/22/1996PNR
DetailsWes Worcester
HE WOULD LIKE IT THIS A.M. IF POSSIBLE...... needs bond as per public works for driveway
INSP - Final10/21/199610/22/199610/22/1996ACANC
Details
10/22/96 338 - EARLY A.M. cancelled until the p/w is satisfied
INSP - Conference10/21/199610/21/199610/21/1996 PASS
Details
/ / 338 - conf with 325 about the inspection to be performed no insp afteruntil there is an ok by the director of the p&z dept
INSP - Final10/18/199610/21/199610/21/1996ANR
Details
10/21/96 338 - FINAL REINSPECTnot ready
INSP - Final10/15/199610/16/199610/16/1996AFAIL
DetailsWes Worcester
10/16/96 342 - George to sign off handrail, rock stairwell w/5/8's rock, elevator, ck smk detr for series and battery bk up, ck for Records lette
INSP - Conference9/24/19969/24/19969/24/1996APASS
DetailsWes Worcester
ck on fence around pool & handrails (4"sphere, 34-38")
INSP - Final9/23/19969/24/19969/24/1996ANR
DetailsWes Worcester
INSP - Conference6/21/19966/24/19966/24/1996PPASS
DetailsWes Worcester
06/24/96 342 - MON. P.M.
INSP - Framing/Rough-in4/8/19964/8/19964/8/1996PPASS
DetailsWes Worcester
INSP - Framing/Rough-in3/29/19964/1/19964/1/1996PCANC
DetailsJim Sly
03/29/96 316 - SENT ON WRONG DATE....and to wrong inspector.... I sent to Wes 342. Jim Sly
INSP - Framing/Rough-in3/29/19964/1/19964/1/1996APASS
DetailsWes Worcester
INSP - Conference2/8/19962/9/19962/9/1996APASS
DetailsJim Sly
Walk thru- framing inspection with framer. Jim Sly
INSP - Carpentry2/8/19962/8/19962/8/1996PFAIL
DetailsJim Sly
Walk thru with framer, pointed out areas of concern for framing inspection: blocking, draftstops, load transfers, beam rotation, etc. Jim Sly.
INSP - Footings10/18/199510/19/199511/7/1995APART
DetailsCarl Dependahl
10/18/95 340 -
INSP - Conference8/25/19958/25/19958/25/1995 PASS
DetailsCarl Dependahl
/ / 340 -
INSP - Footings8/16/19958/16/19958/16/1995PPASS
DetailsWes Worcester
08/16/95 342 - GARAGE FTGS OK. 20 MIN
INSP - Footings8/14/19958/14/19958/14/1995APASS
DetailsBob Archibald
Basement footings only.
INSP - Footings8/11/19958/11/19958/11/1995PFAIL
DetailsCarl Dependahl
08/11/95 340 -